Work was carried out on the implementation of the BN 3500 protection system at the fluid catalytic cracking (FCC) installation on the customer's compressor equipment.
- Installation of field equipment.
- System configuration.
- System debugging.
Work was carried out to check the BN3500 protection system on the turbogenerator at the Gdansk power plant.
- Checking the metrological characteristics of the sensors.
– calibration of the channels of the BN 3500 system
- verification of the protection system.
Work was carried out on the implementation of the Ranger Pro system on the customer's compressor equipment.
- Installation of field equipment.
- System configuration.
- System 1 Evo diagnostic server configuration.
- System debugging.
Work was carried out to check the BN3500 protection system on the Auvere turbogenerator at the Narva power plant.
- Checking the metrological characteristics of the sensors.
– calibration of the channels of the BN 3500 system
- verification of the protection system.
- project works on the protection system.
Work was carried out on the configuration of the diagnostics server for the CHP.
- System configuration.
- System 1 Evo diagnostic server configuration.
- System debugging.
- consultations on the development of the vibration monitoring system.